MNG TECHNIC is proud to announce that performance of Third Line Of Defence Modification (TLOD) on A300 B2 / B4 / C4 / F4 aircrafts in accordance with Service Bulletins A300-54-0098 & A300-78-0021 & A300-78-0022. By the mid of April 2008, 3 aircrafts , 12 fan cowl modifications are scheduled to be performed.
There are around 80 aircrafts which are effected from these Service Bulletins and the total cost is estimated 400.000 USD per aircraft. All aircrafts have to be modified until December 31, 2009.

